Please be advised that Fineline Road Marking, working on the behalf of Hazelwood Construction Services & the District of Ucluelet, will be completing road line marking tomorrow October 22, 2024 in the newly paved section between Bay Street and Main Street.

Please anticipate the following during the work:

• Temporary Lane Closures: Some lanes will be closed during the marking process, causing minor traffic delays (Single Lane Alternating Traffic expected for some sections of work)
• Limited Parking Availability: Certain parking spaces will be unavailable while the work is in progress
• Traffic Management: Signs, cones, and traffic control personnel will be in place to guide vehicles and pedestrians safely through the area
• Minimal Disruption: The work is expected to cause short-term inconvenience however all access points and businesses are to remain open

Please exercise caution and obey traffic control persons. For the latest information and project updates, please visit our current construction project website here: Peninsula Road (ucluelet.ca)

We thank you in advance for your cooperation and understanding during this construction period. If you have any questions, or require further information regarding this project, the following people will be available to assist you:

Hazelwood
Sue Bassett
Project Manager
250-716-1940
sbassett@hazelwood.ca

Hazelwood
Ryan Bissenden
Superintendent
250-713-4052
ryan.bissenden@hazelwood.ca

District of Ucluelet
James MacIntosh
Director of Engineering
778-748-8488
jmacintosh@ucluelet.ca